INVESTIGATION OF SLURRY PROPERTIES TO ENHANCE GOLD LEACHING (Old ID 30053)

NQM Gold 2 Pty Ltd
Role

Principal Investigator

Description

This project with the Pajingo Mine involves thesis students solving industry related problems. The main objective is to optimise the production of gold covering 5 main aspects: - Investigate chemical additives to enhance the gold leaching - Determine the relationship between leaching rate and slurry density - Investigate chemical additives that could be used to reduce the slurry viscosity - Determine the relationship between particle size and viscosity for slurry with a P80 of 38microns down to a P80 of 10microns - Investigate ultimate settled density of tailings in a Tailings Storage Facility for tailings initially deposited at 40% solids and 60% solids

Date

01 Jun 2023 - 31 Mar 2024

Project Type

CONTRACT_RESEARCH

Keywords

Gold extraction;Modelling;Slurry dewatering;Process optimisation;Gold adsorption

Funding Body

NQM Gold 2 Pty Ltd

Amount

15000

Project Team

Hayley Neilsen-Burke;Hayley Neilsen-Burke