OPTIMISATION OF THE PROCESSING PLANT FOR GOLD EXTRACTION. (Old ID 27575)

NQM Gold 2 Pty Ltd
Role

Principal Investigator

Description

This project with Minjar Gold involves thesis students solving industry related problems. Therefore, the funding provided by Minjar Gold in mainly to cover analysis that will be performed at the AAC. The main objective is to optimise the production of gold covering 3 main aspects: (1) exploring alternatives to slurry dewatering; (2) investigating pump capacity within Processing Plant and suggest alternatives; (3) investigating and modelling the average slurry residence time in the adsorption tanks in different scenarios.

Date

21 Feb 2022 - 30 Nov 2022

Project Type

CONTRACT_RESEARCH

Keywords

Gold Extraction;Process optimisation;Modelling;Slurry dewatering;Gold Absorption

Funding Body

NQM Gold 2 Pty Ltd

Amount

15000

Project Team

Sakthivel Prakash;Tewodros Dada;Matthew Drane