Hay Point Coal Terminal Marine macrophyte assessment for potential mooring sites – October 2020

Other Publication ResearchOnline@JCU
York, Paul;Van de Wetering, Chris;Rasheed, M.A.
Abstract

Hay Point Coal Terminal (HPCT) is assessing proposals for works to install temporary moorings both inside the Half Tide Tug Harbour (HTTH) and in an area directly to the east of the tug harbour for vessel usage during the construction phase of their Shiploader and Berth Replacement (SABR) Project (Figure 1). Additionally, HPCT has also proposed to use an area for cyclone moorings approximately 5‐10 km off the coast to the south east of Victor Island that has commonly been used for this purpose in the past (Figure 1).

Journal

N/A

Publication Name

N/A

Volume

21/03

ISBN/ISSN

N/A

Edition

N/A

Issue

N/A

Pages Count

15

Location

N/A

Publisher

TropWATER

Publisher Url

N/A

Publisher Location

Cairns, QLD, Australia

Publish Date

N/A

Url

N/A

Date

N/A

EISSN

N/A

DOI

N/A