Soil/landscape assessment and monitoring design for WTMIP 'Catchment Repair and Treatment Systems Design Phase 2' (Old ID 26616)

FNQ NRM Ltd (Terrain Natural Resource Management)
Role

Chief Investigator

Description

The 'Catchment repair and treatment systems phase 2' activity of the Wet Tropics Major Integrated Project (WTMIP) aims to reduce nitrogen loads in runoff from agricultural landscapes by installing treatment wetlands as well as 'denitrification bioreactors' in the Tully and Johnstone catchments. Aspart of this consortium submission (partners include AWC, Alluvium, Premise/Turbid) to Terrain JCU will be involved in assessing soil and landscape features at the proposed sites, collecting and analysing information on soil profiles and helping in the design and implementation of 1 treatment wetland and 5 denitrifying bioreactors.

Date

01 Jun 2019 - 31 Dec 2019

Project Type

CONTRACT_RESEARCH

Keywords

Sugarcane;Water Quality;Nitrate;Runoff;Wet Tropics;Great Barrier Reef

Funding Body

FNQ NRM Ltd (Terrain Natural Resource Management)

Amount

13740

Project Team

Alex Cheesman