Abrasive Blasting - Are There Any Environmental Concerns (Old ID 23046)

Powerlink Queensland
Role

Principal Investigator

Description

The re-surfacing and re-use of existing high voltage towers instead of removing and replacing with new structures has the potential to alter the way that power transmission infrastructure is used in the long term in Queensland. This project will look at using abrasive blasting in the high value and sensitive landscape of the rainforests of the Wet Tropics and will develop the science narrative around how the process interacts with the local environment.

Date

01 Aug 2016 - 31 Jul 2017

Project Type

CONTRACT_RESEARCH

Keywords

Invertebrate Physiology;Ecophysiology;Aerosols

Funding Body

Powerlink Queensland

Amount

74284

Project Team

Tobin Northfield;Lucas Cernusak