Soil/landscape assessment and monitoring design for WTMIP ‘Catchment Repair and Treatment Systems Design Phase’ (Old ID 24976)
Role
Principal Investigator
Description
This project contributes to the Wet Tropics Major Integrated Project (WTMIP) in the Johnstone and Tully catchments. The ‘Catchment repair and treatment systems’ activity area of the WTMIP aims to reduce nitrogen loads in runoff by installing and restoring wetlands and installing ‘denitrification bioreactors’. As part of the design phase of that activity we will assess soil and landscape features at the proposed sites and design the monitoring program to assess their effectiveness. This assessment and monitoring design will be done in collaboration with Australian Wetland Consulting and Alluvium, who will design the installations themselves.
Date
01 Apr 2018 - 31 Dec 2018
Project Type
RESEARCH_TENDER
Keywords
Sugarcane;Water Quality;Nitrate;Runoff;Wet Tropics;Great Barrier Reef
Funding Body
FNQ NRM Ltd (Terrain Natural Resource Management)
Amount
35511
Project Team
Alex Cheesman;Nathan Waltham